Sites and machinery
Five production sites.One integratedindustrial platform.
350,000 m² of operational areas, 46,000 m² covered and 4,300 m² of technical and executive offices between the Milan area and the port of Livorno.
The sites
From the headquarters in Magenta to the dockside in Livorno.
Each site has a role in the cycle: engineering and advanced manufacturing in Magenta, metalworking in Santo Stefano Ticino, modular structures and assembly in Ossona and Inveruno, large modules and final assembly in Guasticce, next to the port.
- 01
- 02
- 03
- 04
- 05
Guasticce (LI)
95,000 m² yard8,000 m² covered800 m² officesDirect access to the port of Livorno
Open in Maps
Facilities
Space for large-scale production.
production sites in Italy
covered facilities
technical and executive offices
of solar power installed
Machinery
Large formats, high precision, in-house.
We control the whole production process because we own large-format, high-precision machinery. Constant investment in high-performance equipment guarantees repeatable quality, shorter lead times and reduced dimensional risk on critical components.
PAMA Speedmill 4000B gantry milling machine
A large-format, very high-precision gantry milling machine for any component that requires minimal tolerances, perfect surfaces and total repeatability: heat exchangers, shelters and complex structures.
- X axis17,000 mm
- Y / Z / W axes5,000 / 2,000 / 1,000 mm
- Rotary table3,500 × 3,500 mm · 65,000 kg
- SpindleDirect drive · 82 kW · 2,494 Nm · 4,000 rpm
- Tool magazine80 tools · 5-sided machining
- CNCSiemens SINUMERIK ONE
Cutting and bending
- Laser cuttingBystronic 12 × 2.5 m · 2 × Trumpf 4 × 2 m
- Plasma cuttingESAB 12 × 3 m
- Press brakesBystronic 8 m · 800 t · Schiavi 9 m · 800 t · 2 × Trumpf 4 m · 500 t · 3 × Schiavi 4 m · 350 t
- ShearsSchiavi 8 m · 2 × Schiavi 4 m
- PunchingAmada, 50 tools
- Profiles12 m 5-axis machining centre · 5 band saws
- Roll bending3 × 4-roll machines, 3 m, up to 32 mm
Surface treatments
- Sandblasting and painting booths5, from 10 × 27 m to 17 × 45 m
- Pickling and passivation booths3, from 8 × 15 m to 17 × 27 m
- Climatic chamberThermal tests from −35 °C to +70 °C
- Clean roomISO 8 · 20 × 40 m · height 10 m
Treatment booths are available at every production site, so protection and finishing cycles never leave the Group.
The 100% in-house production cycle
Where each phase happens.
Engineering & Design
Fabrication & Machining
Surface Treatments & Painting
Integration & Cabling
Testing & Quality Control
Packing & Shipment
Projects
Built here, installed worldwide.

JV Fluor / JGC
Five 67-metre Field Auxiliary Rooms, ready for installation at an LNG plant in Canada
Five fully prefabricated and integrated Field Auxiliary Rooms up to 67 metres long, engineered, built across several Group sites and loaded directly at the…
Discover
Projects
Inlet and exhaust ducts for Frame 9 gas turbines
Inlet and exhaust ducting for Frame 9 class heavy-duty gas turbines, fabricated in carbon and stainless steel, trial-fitted and inspected in-house before delivery.
DiscoverVisit us
Would you like to visit our sites?
We regularly welcome clients and partners for audits, factory acceptance tests and technical meetings.